|
|
Production of technical films
|
|
|
● Film productionStanimir CHIPEV
|
|
|
|
|
|
|
|
|
|
|
The TPA is able to produce technical films with professional equipment through a qualified cameraman. Films which are produced until now are available free of charge:
- Paving of low temperature asphalt – road B 106, Sept. 2004 (7`48 min)
- Container storage areas with STRABAPHALT®, Harbor Emmelsum, April 2005 (7`49 min)
- Renewal of a bridge sealing during one weekend with STATIFLEX® BA-EP, Düsseldorf, road Mörsenbroich, Sept. 2005 (12`27 min)
- Noise and vibration protection, TRAMTEX test section - tram line Leipzig, April 2006 (8`19 min)
- Mastic asphalt with noise advantages, BAB A 261, April/Mai 2006 (12 min)
- Reconstruction Container terminal Buchardkai, Hamburg (11`05 min)
- High capacity asphalt (7`38 min) 2005/2006
- In Situ compaction and paving of base layers with one Mix Paver, BAB A7 motorway renewal, July - Dec. 2006, (10`00 min)
- Natürlich Gussasphalt - vielseitig und umweltfreundlich (20 min)
- Cold recycling in-situ with a twin-shaft compulsory mixer (16 min)
- Dolomite Asphalt - Great Garden, Dresden 2008 (14 min)
- Main issue concrete – central concrete mixing plants for the building sites of the Airport Berlin International BBI, 2007 (22min)
|
|
|
|
|
|
|
|
|